Manufacturing Case Study
TM

Tuwaiq Metal Works

A custom steel fixture manufacturer running two product lines out of one facility.

Manufacturing · 65 employees · 1 facility, 2 product lines

18% reduction in material waste

The challenge

Tuwaiq Metal Works produced custom steel fixtures across two product lines but had no formal bill-of-materials system — production staff estimated material needs from memory and prior job sheets, leading to frequent over-ordering and unexplained scrap.

The previous workflow

  • Work orders written on paper travelers that followed the job through the shop floor
  • Bills of materials existed only as informal notes from the shop supervisor
  • Production costs (materials + labor) reconciled manually at month-end against purchase invoices
  • Waste and scrap not tracked directly — only inferred later from inventory shrinkage
Implementation

How the Dobbx rollout went

1

Discovery

Documented formal bills of materials for the top 15 product variants across both lines.

2

Module setup

Built a custom BOM and work-order app in Studio for production costing.

3

Data migration

Loaded standard BOMs, current inventory levels, and open work orders.

4

Go-live

First digital work order issued on the shop floor in week 4.

Live in 4 weeks.BOMs for the top 15 product variants were digitized before go-live; the remaining catalog followed over the next quarter.
Modules used

What runs the business day to day

StudioProject Management
Automation applied

What moved from manual to automatic

Paper travelers had no link to actual inventory consumption.

Digital work orders in Studio auto-deduct BOM components from stock on issue.

Production cost reconciled manually at month-end, often a rough estimate.

Actual material and labor cost rolls up automatically per work order as it closes.

Scrap only discovered weeks later, inferred from inventory shrinkage.

Waste is logged against each work order in real time, visible the same shift.

Before & after

The difference, side by side

MetricBefore DobbxAfter Dobbx
Material waste as % of input~11%~9% (18% relative reduction)
Production cost visibilityMonth-end estimatePer work order, real time
Work order formatPaper travelerDigital, Studio app
Measurable results

What changed, in numbers

18%

Reduction in material waste

SAR 95K

Annual material savings

60%

Faster production cost close

4 weeks

To go live on the shop floor

In their words

Why Tuwaiq Metal Works chose Dobbx

We finally have a real bill of materials instead of tribal knowledge. When a job comes off the line, we know exactly what it cost us in material and labor — and where the scrap came from.

Mohammed Al-Otaibi

Plant Manager, Tuwaiq Metal Works

Explore the solution

See the full industry solution

M

Manufacturing on Dobbx

Raw material to finished goods

Ready for results like Tuwaiq Metal Works's?

Start free with no credit card required. Install the modules above in minutes.

Start free trial